Spread Footing
- Cut
Distance = Depth/Tan(Slope)
TopWidth = Width+2*(Space+Distance)
TopLength= Length+2*(Space+Distance)
BottomWidth=Width+2*Space
BottomLength=Length+2*Space
BottomArea=BottomWidth*BottomLength
TopArea=TopWidth*TopLength
Cut = (TopArea+BottomArea+Sqr(BottomArea*TopArea))*Depth/3- SandFill = (Width+2*OverSize)*(Length+2*OverSize)*ThicknessSandFill
- LeanConcrete = (Width+2*OverSize)*(Length+2*OverSize)*ThicknessLeanConcrete
- Concrete = Width*Length*Higth+(Width*Length+0.10+Sqr(Width*Length*0.10)) *HigthTaper/3
- Form = (Width+Length)*2*Higth
- FillBack = Cut-Concrete-SandFill-LeanConcrete
- LowerWidthBar = (Width-FootingCovering*2+2*(Higth-FootingCovering*2)) *NumLowerWidthBar*WeighOfBar
- LowerLengthBar = (Length-FootingCovering*2+2*(Higth-FootingCovering*2)) *NumLowerLengthBar*WeighOfBar
- UpperWidthBar = (Width-FootingCovering*2+2*NumUpperWidthBar*WeighOfBar
- UpperLengthBar =(Length-FootingCovering*2+2*NumUpperLengthBar*WeighOfBar
- HookWidthBar = HookLength*NumLowerWidthBar*WeighOfBar
- HookLengthBar = HookLength *NumLowerLengthBar*WeighOfBar
- StirrupBar = ((Length+Width)*2-FootingCovering*2)*NumStirrupBar*WeighOfBar
- Wire = TotalBar*ConstantWire/1000
- Nail = Form*ConStantNail
Back to Top
Back to Top |
copyright 2002 by CiviSoft |